Structure installation
Piles, frames, purlins and panel fixing, in order. We manufacture the structure ourselves, so it is installed by people who know it.
The structure is delivered to site, or we install it ourselves, on pile foundations.

Step 1 of 6
The topographic survey and the geotechnical study show where the structure goes and how deep the piles must be driven.
Piles, frames, purlins and panel fixing, in order. We manufacture the structure ourselves, so it is installed by people who know it.
We can take on the whole system, turnkey (EPC): design, procurement, installation and commissioning. The quote states clearly what we do ourselves and what is subcontracted.
Packing, dispatch, transport to site and installation support, as needed. The exact scope is set in the contract.
The structure is sized for the site, manufactured and installed. The topographic survey and the geotechnical study come first.
Request a quote →The location, the capacity and the stage it is at. We will reply with the next steps.
Before the park: whether it can be connected to the grid and whether it is worth building.
Details →The site, the calculations, the grid connection design and the permits, up to the building permit.
Details →Standalone or co-located battery systems, from engineering to commissioning.
Details →For solar parks, storage and substations: schedule, cost, risks and permits under control until handover.
Details →