Design and permitting
Before the structure come the site, the calculations and the permits. We prepare all of them, so the project reaches the construction site with its paperwork in order.
- 1
Preliminary site assessment
Solar potential, the nearest substation, site constraints: slopes, access, protected areas.
- 2
Topographic survey and geotechnical study
Through licensed partners. They are the basis for sizing the foundation and laying out the structure on site.
- 3
Technical documentation
Drawings, structural calculations, data sheets — what the permitting process requires.
- 4
Grid connection design
The technical design and construction details of the installation that connects the park to the grid.
- 5
Permits and approvals
The approvals required by Romanian law and the building permit.
Tell us about your project
The location, the capacity and the stage it is at. We will reply with the next steps.
Other services
Grid connection and feasibility studies
Before the park: whether it can be connected to the grid and whether it is worth building.
Details →Installation
We deliver the structure to site or install it ourselves, on pile foundations.
Details →Turnkey storage (BESS)
Standalone or co-located battery systems, from engineering to commissioning.
Details →Owner’s Engineering & Project Management
For solar parks, storage and substations: schedule, cost, risks and permits under control until handover.
Details →