Design and permitting

Before the structure come the site, the calculations and the permits. We prepare all of them, so the project reaches the construction site with its paperwork in order.

  1. 1

    Preliminary site assessment

    Solar potential, the nearest substation, site constraints: slopes, access, protected areas.

  2. 2

    Topographic survey and geotechnical study

    Through licensed partners. They are the basis for sizing the foundation and laying out the structure on site.

  3. 3

    Technical documentation

    Drawings, structural calculations, data sheets — what the permitting process requires.

  4. 4

    Grid connection design

    The technical design and construction details of the installation that connects the park to the grid.

  5. 5

    Permits and approvals

    The approvals required by Romanian law and the building permit.

Tell us about your project

The location, the capacity and the stage it is at. We will reply with the next steps.