Practices · Practice II · 9 services

Engineering and design

Project documentation, from feasibility to construction details.

  • D01

    Feasibility studies

    Solar, storage and substations, with technical and economic indicators.

  • D02

    Building permit design

    Documentation for the building permit (DTAC).

  • D03

    Technical and detailed design

    Execution design and construction details for all disciplines.

  • D04

    Substation design

    110 kV/MV substations: primary, secondary, protection, teleprotection, SCADA.

  • D05

    Grid connection design

    110 kV and MV overhead and underground lines, point of connection.

  • D06

    Grid studies

    Load flow, short circuit, power quality, compliance with ANRE grid codes.

  • D07

    PV mounting structures

    2P, 2L and 3L tables in S350GD+Z275 steel, with bills of materials.

  • D08

    Cost estimates

    General and per-object estimates under Government Decision 907/2016.

  • D09

    Construction schedules

    Critical path, value schedule and cash flow.

Where it comes in

  1. DevelopmentD01 · D06
  2. PermittingD02
  3. DesignD03 · D04 · D05 · D07 · D08 · D09
  4. ProcurementD07
  5. Construction—
  6. Testing and COD—
  7. Operation—

Contact

Request a consultation.

Send us the status of your project. Within two working days you receive a first view of the risks and a proposed engagement.